Projects

Shaw-Nass is equipped primarily for the production of pre-fabricated pipe spools.  The facility has supported multiple projects simultaneously producing upwards of 3000 spools per month, whilst maintaining emphasis on quality and individual client schedules.  More and more major engineering companies are withdrawing from the traditional on site fabrication and placing there integrated spool manufacturing into the hands of dedicated spool fabrication facilities, cutting back dramatically on fabrication and welding errors.

COMPLETED PROJECTS HISTORY

Client

Project

Location

Scope of Work

Period

No. of Spools

KGS

Saudi Arabian Bechtel Co.

Shoaibha Power Project

Jeddah, Saudi Arabia

Carbon Steel, Stainless Steel, Galvanised and Cement Lined Spools 2"-60"

1996-1999

6924

3,229,507.16

Mitsubishi Heavy Industries.

Lal Pir Power Plant

Pakistan

Carbon Steel & Stainless Steel

1996

2000

1,992,560.97

A A Nass / Snamprogetti

-

Kuwait

Carbon Steel and Stainless Steel Low Temp. 2"-36" STD/S80.

1997

2000

620,338.45

Bechtel Inc.

Phase I

India

Carbon, Stainless, and Chrome Steel Spools 2"-54" STD/S 160.

1996-1997

6000

843,034.82

Mitsubishi Heavy Industries.

KW4 Power & Desalination Plant

Kuwait

90 - 10 Cu-Ni Clad Piping. 36" - 55" STD Wall.

-

300

270,395.85

ABB Power Generation Ltd. London.

Taiwan Power Co.

-

Carbon Steel and Stainless Steel Low Temp. 2"-30"

-

717

162,890.15

Hai-Fu Everpower, IPP Co. Ltd.

Hai-Fu Power Plant

Taiwan

Carbon Steel and Stainless Steel Low Temp. 2"-30"

-

717

122,268.34

Mitsubishi Heavy Industries.

Al Zara Thermal Power Plant

Syria

Stainless and Carbon Steel 2"-36".

1998

6024

1,106,835.66

Eastern Bechtel Co.

Taweelah "B" Extension Project

Abudhabi, UAE

Carbon Steel and Stainless Steel Low Temp. 2"-30"

1997-1999

1087

502,554.68

ABB Lummus Alireza

Kemya Olefins

Juabail, Saudi Arabia

Stainless and Carbon Steel 2"-30".

1998-1999

10,665

3,419,151.26

American Bechtel Inc.

Dabhol Phase II Power Plant

Dabhol, India.

CS, SS and Chrome Piping.

1999-2000

4,786

1,809,238.52

Stone & Webster Int Corp.

Pha Lai Power Plant

Vietnam

CS, SS, Chrome and PVC Piping.

1999-2001

3,354

884,066.44

American Bechtel Inc.

Sidi Krir Units 3 & 4.

Egypt

CS, Chrome, SS, Cement Lined and Molybdenum Piping.

1999-2001

2,861

901,406.07

Saudi Aramco

-

Dhahran, Saudi Arabia

CS Induction Bends.

2000

8

2,143.10

Shaw Aiton, Australia.

-

Australia

4 off Manifolds.

2000

4

2,113.20

Shaw Group UK Ltd.

Ringsend

Ringsend, Dublin

Fabricate and Deliver Hot Induction Bends

2000-2001

41,921.11

BAPCO

Steam Ring Assemblies

Bahrain

Carbon Steel Spools 4"-36" STD.

2000

60

412.76

Bramco

-

Bahrain

Fabricate and Supply induction bends.

2001

321

26,308.39

ZPEB, Qatar

Dukhan Fields, Pipeline Project.

Qatar

Fabricate and Deliver Hot Induction Bends

2001

187 + 3

41,969.47

BAPCO

Sitra Wharf

Bahrain

Fabricate and Supply 16 cradles.

2001

16

2,642.16

MCSC

Kero Merox

Bahrain

PWHT of spools

2001

-

-

 

ON GOING PROJECTS

Client

Project

Location

Scope of Work

Period

No. of Spools

KGS

Babcock Hitachi Kure KK

Ghazlan II Power Plant

Ghazlan, Saudi Arabia

Inconel G25, Stainless & Carbon Steel

on going

953

64,361.06

Bechtel Inc.

Ghazlan II Power Plant

Ghazlan, Saudi Arabia

Carbon Steel 2" - 30" Spools

on going

15654

3,816,175.00

Babcock Hitachi Kure KK

Huntstown Power Plant

Dublin, Ireland

Prefabricated Piping

on going

565

164,735.00